Geodetic control network for the "Čoka Rakita" project
Geodetic control network for the "Čoka Rakita" project
Geodetic control network for the "Čoka Rakita" project
Geodetic control network for the "Čoka Rakita" project
Geodetic control network for the "Čoka Rakita" project
Geodetic control network for the "Čoka Rakita" project
1 / 6

Geodetic control network for the "Čoka Rakita" project

Location: Rakita, near Bor

Premer Savković d.o.o. has established the geodetic control network for the "Čoka Rakita" project at the Rakita site near Bor, for the client DPM Crni Vrh. The works covered the stabilization and measurement of the project's primary geodetic network, through several long GNSS static observation sessions on SREF points of the national reference network and on the project network points.

Based on the measurements and the network adjustment, the project coordinate system and its link to the State Coordinate System were defined. The established network serves as the geodetic basis for setting out the structure and for monitoring ground and structural displacement during construction.

September 8, 2026
Aerial LIDAR survey of a power line route
Aerial LIDAR survey of a power line route
Aerial LIDAR survey of a power line route
Aerial LIDAR survey of a power line route
1 / 4

Aerial LIDAR survey of a power line route

Location: Western Serbia

An aerial LIDAR survey was carried out along the route of a planned power line, roughly 42 km long. The data was used to build a digital terrain model and analyze the corridor, with a point cloud density that allows precise positioning of pole locations and assessment of vegetation within the corridor.

August 27, 2026
3D laser scanning of a factory hall
3D laser scanning of a factory hall
3D laser scanning of a factory hall
1 / 3

3D laser scanning of a factory hall

Location: Belgrade

A latest-generation terrestrial scanner was used to build a 3D model of a production hall and the surrounding infrastructure. The result is a detailed point cloud that lets the investor plan reconstruction work without further site visits.

August 14, 2026
Foundation check — residential complex
Foundation check — residential complex
Foundation check — residential complex
1 / 3

Foundation check — residential complex

Location: Novi Beograd

After the building's foundations were completed, our engineering team carried out a geodetic check and produced a report confirming compliance with the designed building line, confirming the correct position to the investor before construction continued.

July 30, 2026
Setting-out design project — industrial zone
Setting-out design project — industrial zone
Setting-out design project — industrial zone
Setting-out design project — industrial zone
1 / 4

Setting-out design project — industrial zone

Location: Lazarevac

A geodetic setting-out design was produced for a new production hall, aligned with the cadastral data and defining all reference points needed by the contractor.

July 18, 2026
Static GNSS survey method
Static GNSS survey method
Static GNSS survey method
1 / 3

Static GNSS survey method

Location: Zrenjanin

A static GNSS survey of a network of reference points was carried out, followed by post-processing of the data and a full geodetic works report for the investor.

July 5, 2026
Terrestrial survey of a construction site
Terrestrial survey of a construction site
Terrestrial survey of a construction site
1 / 3

Terrestrial survey of a construction site

Location: Bor

Our team carried out a terrestrial survey of the construction site and surrounding infrastructure, producing an up-to-date site plan to help track the progress of the works.